About Us

Corporate Milestones

1999

◇Joint developed with TNB Research Sdn Bhd on development and manufacturing of Single Phase Electronic kWh Meter

2000

◇MIM incorporated by setting Temasya Industrial Park, Glenmarie, Shah Alam -up factory at No.15, Jalan Pengacara U1/48, Temasya Industrial Park, Glenmarie, Shah Alam, Selangor

2002

◇IEC 61036:1996 certification for Smart Card Smart Card Electronic Prepaid kWh Meter from Parkside Laboratories Ltd, Electronic kWh Meter and New Zealand (now known as Underwriters Laboratories International NZ)

2004

◇Appointed MIM as Single Phase Electronics kWh Meter vendor to TNB under TNB Entrepreneur Development Program IEC 61036:1996, IEC 61000-4.3:1995 and IEC 61000-4.4:1995 certification for Single Phase 2 Wire Electronic kWh Meter (model G2) and Single Phase 2 Wire Electronic Prepaid kWh Meter (model STABIL) from Parkside Laboratories, New Zealand

2006

◇MIM been appointed as TNB’s Vendor under Ministry of Entrepreneur and Corporation Development (MECD) Entrepreneur Development Program

2007

◇IEC 62053 (model G3) from Parkside Laboratories Ltd, New Zealand MIM’s Calibration and Testing Laboratory accredited by STANDARDS MALAYSIA with accreditation MS ISO/IEC 17025:2005

2008

◇MIM relocated at No. 3, Jalan Pemberita U1/49, Temasya Industrial Park, Glenmarie, Shah Alam, Selangor

2009

◇Full MIM as Three Phase Electronic Whole Current Meter vendor to TNB under implementation 5S module in MIM and certified by TNB Appointed TNB Entrepreneur Development Program

2010

◇Installed complete Surface Mount Technology (SMT) line for MIM in-house full manufacturing process
◇MIM certified ISO 9001:2008 for Quality Management System

2011

◇MIM graduated from TNB Entrepreneur Development Program and appointed as TNB Preferred Vendor
◇Open sister company in Kota Kinabalu, Sabah, ONE MIM (Sabah) Sdn Bhd

2013

◇Completion of 3 Phase Modem prototypes for tested at SIRIM QAS International Sdn. Bhd. and obtained Certificates for:
• UL-94:1997 – Test for Flammability of Plastic Materials for Parts in Devices and Appliances
• ETSI EN 301 511 V9.02 (2003-03) – 3.2 Technical Requirements: Radio Frequency
• MS IEC 60950-1:2007 – Electronic Safety Test EN61000-6-1:2007, EN55022:2006, SKMM WTS WMT MT (Rev. 1.01:2007) Clause 4.2(b) and ETSI EN 301 489-1 & ETSI EN 301 489-7
• Electromagnetic Compatibility Test (EMC)

2015

◇Awarded a contract of supply and deliver 11,500 units of Three Phase Whole Current Meters to SESB.

2016

◇Awarded a contract supply and deliver 16,960 units of Three Phase Low Voltage, CT Operated to TNB

2017

◇Awarded a contract supply and deliver of 800,000 units of Cable Tie for Aerial Bundle Cable to SESB.
◇Awarded a contract supply and deliver 42,500 units of Single Phase Electronic kWh Meters to SESB.

2018

◇Awarded a contract of supply and deliver 48,000 units of Three Phase Whole Current Meters to TNB.
◇Awarded a contract supply and deliver 12,500 units of Three Phase Low Voltage, CT Operated to TNB
◇Awarded a contract supply and deliver 12,500 of GPRS Modem Brand Landis + Gyr

2019

◇Awarded a contract supply and deliver 67,500 units of Single Phase Electronic kWh Meters to TNB (Optional Value)
◇Awarded a contract supply and deliver 198,000 units of Single Phase Electronic kwh Meter (Model M-Meter) to TNB

2020

◇Awarded a contract of supply and deliver 60,000 units of Single Phase and Three Phase AMI to TNB

2021

◇Manufactured and deliver 52 units of Single Phase Electronic kWh Prepaid Meter to Pusat Perubatan Universiti Malaya (PPUM)